        單項選擇題

        Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the(2)and must develop enough knowledge about the(3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

        A.logical models 
        B.physical models 
        C.design models 
        D.implementation models

        題目列表

        你可能感興趣的試題

        • 單項選擇題

          超出項目經(jīng)理控制的成本增加因素,除了存款利率、貸款利息和稅率外,還包括()。

          A.項目日常開支的速度和生產(chǎn)率 
          B.項目日常開支的速度和工期拖延 
          C.項目補貼和加班 
          D.原材料成本和運輸成本 

        • 單項選擇題

          經(jīng)濟計量分析的工作程序依次是()。

          A.設定模型、檢驗模型、估計模型、改進模型 
          B.設定模型、估計參數(shù)、檢驗模型、應用模型 
          C.估計模型、應用模型、檢驗模型、改進模型 
          D.搜集資料、設定模型、估計參數(shù)、應用模型 

        掃碼聯(lián)系掃碼聯(lián)系在線客服
        反饋使用問題
        掃碼練習掃碼使用找答案小程序
        手機搜題/刷題/上網(wǎng)課

        版權所有?考試資料網(wǎng)(ppkao.com) 長沙求知信息技術有限公司 All Rights Reserved

        湘公網(wǎng)安備 43010202000353號備案號: 湘ICP備14005140號-2

        經(jīng)營許可證號 : 湘B2-20140064

        • 聯(lián)系客服
        • 小程序
        • 桌面端下載
        • 回到頂部

        感谢您访问我们的网站,您可能还对以下资源感兴趣:

        99久久久国产精品免费下卡

              <center id="02pl2"></center>